16131 N. Eldridge Parkway Ste 200 Tomball, Texas 77377
Phone: (281) 205-0022 Fax: (281) 205-0376
Email: sales@ttengineering.com

Content on this page requires a newer version of Adobe Flash Player.

Get Adobe Flash player

Drilling Rig - Energy Services - General Engineering Services - Land Drilling Structures - Fast Moving Land Rigs - Offshore Drlling Structures

Maverick® 750 K Fast Moving Rig

The Maverick® 750 is a fast-moving land rig mast and substructures for several drilling contractors. The Maverick® 750 Drilling Structure incorporates features and rig-up concepts honed by T&T in our role as the designers of state-of-the-art fast-moving masts and substructures for several leading drilling contractors. Designed for use in the toughest of horizontal drilling applications, the rig components transport without removal of the drilling equipment including top drive with mud hose and electrical service loop, rotary table, torque wrench, standpipe manifold and BOP, thus reducing rig-up time and equipment handling damage.

Specifications

  • Mast and Substructure per API 4F 3rd Edition
  • Maximum static rated hook load 750,000#
  • Maximum static rated rotary load 750,000#
  • Maximum static rated set back load up to 550,000#
  • Maximum design wind speed (w/o setback) 110 mph

Shipping dimensions

  • 14' wide x 14'-6" high loads
  • 20 k axle loadings
  • Mast loads are designed to be moved using typical oilfield trucks and trailers with T&T supplied transport skids for mast sections; no specialized running gear is required
Maverick® 750 K 

Shipping Loads

  • Substructure Off Drillers Side Box Assembly with standpipe manifold, Dead Line Anchor
  • Substructure Drillers Side Box Assembly
  • Drill Floor Center Section with Drawworks, Rotary Table, Drive and Iron Roughneck, (easily split into 2 sections if required)
  • AC Drawworks offloaded to DFCS at ground level from transport
  • Mast Bottom Section with lower standpipe
  • Mast Top Section with crown, traveling block, folding racking board assembly
  • Mast Top Section includes crown, traveling block, folding racking Board assembly
  • Wrangler® BOP Handling system with 13-5/8" four ram stack 30 or 40 ton.

Rig-Up

  • Craneless mast and substructure rig up
  • Substantial use of hydraulics to mechanize rig-up operation and enhance crew safety
  • Mast raising cylinders are used for raising substructure also, reducing initial rig cost and spares budget
  • Essentially complete built-in drill floor fluid containment